Skip to content
  • English
    • French

SEARCH

Follow us

Linkedin page opens in new window
CAP – Demo-ID.fr
Conception d'automatres de pilotage de tunnelier
CAP - Demo-ID.fr
  • Home
  • About us
    • In brief
    • Our values
    • The team
    • History
  • Expertise
    • Navigation
    • Steering and Piloting
      • Ring sequences calculation software
      • Piloting assistance
      • Automatic steering
      • Steering analysis
      • Automatic tailskin clearance measuring system
    • Real time monitoring
    • Database and analysis interface
    • Connected tools dedicated to the production and quality survey
      • Traceability and scanning of segments using a reader connected to the base
      • Survey and analysis of tunnel cracks using a tablet connected to the base
      • Integration of surface settlement data
      • Representation of the axis and TBM position on google maps
    • Shift report application
    • CAP 3D
    • Innovation/improvements
  • Projects
    • Recent projects
    • Projects
    • Media library
  • News
  • Contact
  • Home
  • About us
    • In brief
    • Our values
    • The team
    • History
  • Expertise
    • Navigation
    • Steering and Piloting
      • Ring sequences calculation software
      • Piloting assistance
      • Automatic steering
      • Steering analysis
      • Automatic tailskin clearance measuring system
    • Real time monitoring
    • Database and analysis interface
    • Connected tools dedicated to the production and quality survey
      • Traceability and scanning of segments using a reader connected to the base
      • Survey and analysis of tunnel cracks using a tablet connected to the base
      • Integration of surface settlement data
      • Representation of the axis and TBM position on google maps
    • Shift report application
    • CAP 3D
    • Innovation/improvements
  • Projects
    • Recent projects
    • Projects
    • Media library
  • News
  • Contact

Albums Archives: International

Metro Line 3, Phase 4 – Cairo
Metro Ligne 3 Phase 4 - Le CaireMetro Ligne 3 Phase 4 - Le CaireMetro Line 3, Phase 4 – Cairo

Metro Line 3, Phase 4 – Cairo

Construction/tunnel photos, InternationalBy TunelsouslaManche00123 January 2022
Metro Ligne 3 Phase 4 - Le Caire
Métro du Caire – ligne 3 Phase 3Metro Ligne 3 Phase 4 - Le Caire

Metro Ligne 3 Phase 4 – Le Caire

Construction/tunnel photos, InternationalBy TunelsouslaManche00123 January 2022
link to the homepageAll rights reserved | Legal | Site map | Follow us

link to the Vinci Construction website

Go to Top
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.